Solar Light Ridge Vent Rack and pinion drive. Single or double opening.
Type | Description |
---|---|
Gothic Ridge Vent | On poly or rigid glazed roofs. Rack and pinion drive |
Insulator Roof Vent | Mounts at gutter. Rack and pinion drive. Single only |
Wall vents | Lifting equipment inside house. Rack & pinion drive |
Pad vents | Lifting equipment outside house. Rack & pinion drive |
Roll Up Wall | Poly wall rolls from ground up onto a shaft |
Drop Down Wall | Poly wall opens from the eave down |
Oxnard Vent | Fixed ridge vent for Insulator houses. Requires inflation of a tube to close |
Greenhouses | Equipment | Accesories
Vents | Roll up Wall | Drop Wall | Benches | Energy Curtain | Agra Lock | Door | Equipment Mounts | Agra Kool II Positive Pressure Cooling | PC8 Glazing System | Glazing Accessories
Benches: Rolling Benches | Stationary Benches | T-rail bench | TAVA bench | Caster Benches
Equipment Mounts: Cooling Pad Mounts | Heater Hanger Kits | Exhaust Fan Mounts
PlantCentrics is how we at Agra Tech create a greenhouse system that works for you. It simply means that the greenhouse’s functionality is designed around the plant. What does the plant need to thrive? How do the plant’s requirements change? How does the plant move efficiently in and out of the space?
We design the greenhouse and environmental equipment around the benches and the benches around the plant’s needs.
It’s about the plant AND your growing technique and business plan. It can be traditional hands-on or highly automated. Shipping, receiving, and processing are taken into consideration. All this is taken into account so that you end up with the best performing greenhouse system possible.
Post by:
Admin (Feb 02, 2024)
Category:
Controlled Environment Greenhouse
Greenhouse Structure
Greenhouses
Post by:
Admin (Mar 09, 2023)
Category:
Greenhouse Structure
Greenhouses
Insect Exclusion
Resesarch
Goal: Create a state-of-the-art insect exclusion facility for protection from the Asian Citrus Psyllid
It's a huge project, but after it was completely designed, it took less than six months to make it 100% operable.